– Field buying relocated to the small town at the train yard
– New florist
– For SP installed some traffic
– BGA bunker volume increased to 100000 liters
– Milk removal-in because cows set
– Increased manure and manure capacity in cows
– Installed water storage on yard
– Built manure storage on yard
– Signs made to hof
– Installed material and Particel Holder
– Cattle built on the basis of fabric Script
– Cattle sale at Freight depot
– Installed oil fracking on the basis of the factory script
– Oil sales on Freight depot
Author: Kastor
DOWNLOAD [270 MB]
Leave a Reply
You must be logged in to post a comment.