Version 1.4:
– Sliding doors replaced by the Court through barriers and changed the walls
– Furthermore, 3 sawmills are now installed at the forest on the map, which were equipped with the Colector
– A plant needs about 25 minutes for 1 finished pallet boards
– To be able to do is a ramp was installed to tilt the Langholz
Authors: Giants, Alf62
DOWNLOAD [616 MB]
Leave a Reply
You must be logged in to post a comment.